[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [MiNT] XaAES / GEM memory issues
> > problem. The only problematic thing is that the MiNT's scheduling timer
> > granularity is quite low (max 25 context switches per second, correct me
> Currently it depends on the time slice setting. A value of 1 means 20ms
> per time slice, 2 means 40ms (2 * 20) per time slice and so on.
And 20 ms means 50 Hz. I don't remember the code in intr.spp correctly,
but I have a strong impression, that SLICES=1 means ONE SLICE TO PASS and
make the switch each second time. And this makes 25 Hz, i.e. 40 ms.
--
Konrad M.Kokoszkiewicz
mail: draco@atari.org
http://draco.atari.org
** Ea natura multitudinis est,
** aut servit humiliter, aut superbe dominatur (Liv. XXIV,25)
*************************************************************
** Taka to juz natura pospolstwa, ze albo sluzy ono unizenie,
** albo bezczelnie sie panoszy.